City of Green, Kansas - Nitrate Reduction

April 6, 2017
City of Green
450 gpm

In September 2012, AdEdge Water Technologies was awarded a contract managed by BG Consultants for the equipment pre-selection of a nitrate removal treatment system for the city of Green, Kansas. The scope of the contract included the design, manufacture and startup of the treatment system.

Green is a small community of approximately 125 residents located in northeast Kansas. The town receives water from four wells that alternate in operation. Water testing revealed a sustained nitrate level of 12 mg/L as N; the U.S. EPA maximum contaminant level (MCL) for NO3-N in drinking water is 10 mg/L.

The AdEdge treatment system was designed to treat 40 gallons per minute (gpm) and remove up to a maximum of 25 mg/L of NO3-N, as required by the contract. Treatment was packaged in a compact, skid-mounted unit. The model, APUIX-NO3-2472CO-3-290, utilizes three vessels arranged in parallel, each loaded with AdEdge ADIX-NO3 nitrate-selective anion exchange resin. Two of the vessels are always maintained in service, while the third vessel is offline in regeneration or in standby. The resin is supplied in the chloride form as moist, tough, uniform spherical beads and is NSF 61 certified.

AdEdge Treatment System Features

  • Continuous online nitrate measurement on blended effluent.
  • Modulating valve on bypass line provides a consistent blended effluent nitrate concentration not exceeding 7 mg/L as N, helping to extend regeneration frequency and improving efficiency.
  • The ADIX-NO3 resin is regenerated with a brine solution; the wastewater is taken to sanitary sewer.
  • System control provided by PLC and HMI operator interface screen; PLC provides control of well pumps, chlorine dosing pumps, bypass valve and automatic regeneration operations.
  • Remote monitoring including access to HMI screens, alarm notification via email and SMS.
  • Differential pressure monitoring, local pressure gauges, flow sensors and a central hydraulic panel.

The system was started up in June 2014. The treatment system has consistently removed nitrate levels to below the treatment goal of 10 mg/L as N since it began operation.

Case Study Fast Facts

Engineer: BG Consultants
Location: Green, Kansas
Date: June 2014 
Contaminant treated: Arsenic 
Flow rate: 450 gpm

Read More

Bakersfield Well #26 in California was experiencing high arsenic levels in multiple groundw
In 2013, AdEdge Water Technologies was contacted by Valentine Engineering to participate in a design
In late 2009, Water Works Engineers contacted AdEdge to design and implement an

STAY CONNECTED

Keep up-to-date with our latest news, developments in the water treatment industry, and some general fun.